4D BIM Construction Schedule Animation | 5D Cost Simulation

Updated: Jul 10, 2020

This video simulates the construction assembly of retractable enclosure for an Olympic swimming pool. It illustrates the time, cost, logistics, labour and equipment required in order to assemble the prefabricated components on-site. #4DBIM #5DBIM #ConstructionSimulation


31 views0 comments

Recent Posts

See All